A new foundation for a ’67.
Mark’s Chevelle arrived in June 2026 for a full frame-off restoration. Chris outlined the planned combination: a Roadster Shop Fast Track chassis, a Don Hardy-built 440-cubic-inch LS9, a TREMEC T-56, and Forgeline wheels. The brief is a car that can work on an autocross course and still be enjoyed on the street.
The new chassis arrived later in the summer. By the next update, the team had rough fitted it under the Chevelle’s body. That fitment establishes the relationship between the body, frame, wheels, and the fabrication still to come.
Next up is rear tire clearance: opening the wheel wells to the frame, positioning a 345-section tire, and hand-building new tubs around it. The gallery follows the project from its arrival through the first chassis fitment.
Foundation
Roadster Shop Fast Track chassis
Planned engine
Don Hardy-built 440 ci LS9
Planned transmission
TREMEC T-56
Next fabrication
Rear tire clearance and hand-built tubs
Progress from the Shop
Define the build
A frame-off restoration brief set the direction for the street and autocross project.
Fit the chassis
The new Fast Track chassis arrived and was rough fitted beneath the body.
Make room for tire
The next documented plan is a 345-section rear tire and custom wheel tubs.
Build Gallery
Select a photo to view it full screen. Use the arrows to explore the gallery.
Watch the Work
Chris’s video updates show the sounds, movement, and details behind the photos.
What Are You Building?
Tell us about your car, the work you have in mind, and where you want to take it.
